The following processes must be completed for safe and efficient start up and operation of the device. Please check the following operations.
Checklist
- Mechanical and electrical connections of the device were made.
- Fuel has been fed to the burner and is in usable condition.
- Water has been fed into the boiler.
- Fuel line cleaned.
- There is a filter in the fuel line.
- There is a gas opening / usage certificate (In gas burners)
- Electricity is available.
- The boiler controller and thermostats were connected to the burner in accordance with the project.
- PT 100, pressure transmitter, etc. is connected. (at modulating burners)
- Thermostats (1st stage, 2nd stage, Safety) / Boiler controller is connected.
- There is a daily fuel tank suitable for the burner capacity (In Liquid Fuel Burners) (Two times the hourly consumption of the burner)
- A fuel ring line has been established for burners of Eco 50 and above capacity. (For Fuel-oil Burners) (ring line diagram is sent with the sales offer. You can also get it from our company.)
- The circulation pumps in the system are operational.
- There is a hole 1 meter in front of the flue outlet for flue gas analysis.
WARNING: After completing the above-mentioned checks, this form will be filled out and your device will be commissioned within 3 (three) business days after your request is received by Termo Isı Sistemleri Tic. San. ve A.Ş. If any of the items specified in the checklist are found to be incomplete at the time of commissioning and the system is not found appropriate, your device will not be commissioned and you will be billed as a service occupation fee of TRY 350 plus VAT. It is kindly requested that you pay attention to the completeness of the system before requesting service."